Revision:
Clarifies the timeframe for when homeowners can confirm their warranty online.
Where is the change found?: Front cover of books.
Warranty Confirmation
Your validated Warranty consists of your Application for Enrollment, the Limited Warranty book, and your Warranty Confirmation. You can confirm your warranty has been validated by HOME, and obtain your Warranty Confirmation, AFTER 60 days from your after closing at confirm.rhomeoftexas.com. Please be advised that in some cases it may take 60 days for processing before the warranty is available on the portal. If you do not have access to the Internet, please contact HOME to obtain your Limited Warranty book and Warranty Confirmation.
Revision:
The definition clarifies the meaning of “Resilient Flooring” within the warranty document.
Where is the change found?: Added to definition section.
Resilient Flooring: A floor covering in which the wear surface is non-textile, non-wood, and/or non-stone. Therefore, Resilient Flooring is a floor covering that is NOT carpet, hardwood, laminate, stone, ceramic, or concrete. Examples of Resilient Flooring include Ridged Core Luxury Vinyl Tile and Planks, Flexible Luxury Vinyl Tile and Planks, Sheet Vinyl Flooring, Cork Flooring, Rubber Flooring, Linoleum Flooring, Solid Vinyl Tile, and Vinyl Composite tile.
Revision:
Internet and Wifi wiring connection added to exclusions is the event of loss or damage.
Where is the change found?: Exclusion section.
…to wiring, to and between communication devices from the source of power, whether or not connected to the inte- rior wiring system of the Home. Such devices shall include, but not be limited to, telephone systems, television cable systems, internet, Wi-Fi, intercom systems…
Revision:
Clarifies the timeframe for when homeowners can submit their request for arbitration.
Where is the change found?: Arbitration section.
You begin the arbitration process by giving the Administrator written notice of your request for arbitration of an Unresolved Warranty Issue. The written notice of your request for arbitration must be received by the Administrator no later than thirty (30) days following the expiration of the (specific warranty period) applicable warranty period. However, if you receive notification of an Unresolved Warranty Issue from the Administrator following the expiration of the (specific warranty period) applicable warranty period, then this period is extended and written notice of your request for arbitration must be received by the Administrator no later than thirty (30) days……